Berkley Power Station Processing and Packaging Facility

United Kingdom

Rubb continues to support Cavendish’s Berkley Power Station with a nuclear waste processing facility.

 

The 13.8 span x 12.8m length BVR is custom designed to aid in the recovery and processing of “sludge canisters”—packaged mobile waste currently stored within Berkley’s vaults. Around 1,400 of these canisters are currently stored, so the processing and packaging structure needs to be up to the task.

 

For the project to be a success, safety was of the upmost importance.

 

Rubb was tasked with developing a design which can be easily decontaminated, as the processing facility’s equipment must be disposed of with conventional methods once the project reaches completion. As a result, Rubb had to design the structure with smooth surfaces and minimal contamination traps in mind.

 

Additional protection for personnel and equipment is provided by a 150mm Thermohall® insulation, ensuring no interference from the elements.

 

A 3.5m x 3.5m electrically operated roller shutter door was added to allow easy access for the nuclear waste canisters.

 

Rubb was thrilled at the opportunity to demonstrate the adaptability of Rubb structures, showing that Rubb can meet the requirements of the most challenging and safety-conscious projects.

Building Specifications

Usage

Usage

Waste Processing

Usage

Type

BVR

Span

Span

13.8m

Usage

Length

12.8m

Usage

Eaves

4.4m

Usage

Apex

5.6m

Usage

Door

Roller Shutter

Usage

Completed

21/12/2018

CONTACT RUBB

Contact the Rubb team with your building requirements. We are here to support you throughout your project.

VIEW BROCHURE

Explore the latest Rubb waste brochure. This brochure features the latest projects and structure information.